(22/02/2026)
Radiant dawns the Year of the Horse,
On the sixth day, heaven and earth join course.
Twenty years, our steadfast ship,
Through storm and surge on a fearless trip.
Scarlet milestones mark each land,
Projects rise ...
(12/02/2026)
Twenty years is not merely a measure of time, but a journey long enough to affirm resilience, demanding enough to forge inner strength, and enduring enough to build a solid position ...
(07/01/2026)
On the morning of January 7, 2026, in Hanoi, The Marc 88 office building, located at 88 Tran Thai Tong Street, Cau Giay District, was officially inaugurated and put into operation. ...
(05/01/2026)
On the morning of January 4, 2026, amid the early spring air still carrying a hint of Hanoi’s winter chill, the National Institute of Hematology and Blood Transfusion became warmer with ...
(19/12/2025)
On December 19, 2025, Sigma Engineering JSC was honored and proud to attend the groundbreaking ceremony of the Soc Trang 7 Nearshore Wind Farm – Phase 2, officially opening the next ...