• CLIENT: ACC THANG LONG JOINT STOCK COMPANY

• PROJECT LOCATION: NO.03 LE TRONG TAN STR., THANHXUAN DIST., HANOI

• SCOPE OF WORKS: M&E MAIN CONTRACTOR

• CONTRACT DURATION: FROM 06/04/2016 TO 30/03/2017

Project detail

KEY FEATURES
  • Appointed as the nominated M&E contractor of The Artemis with scale 8.965m2, total investment up to 1.000 billion VND.
  • Took responsibility for designing and deploying mechanical & electrical system for the whole building.
  • Mobilized nearly 600 Sigma’s engineers, technicians and workers involving
  • Managed the project following ISO 9001-2008.
  • Tight deadline with heavy workload.
THE BRIEF
Located in a prime location No.03, Le Trong Tan street  and also the heart of sport, education, healthcare, entertainment area; The Artemis is the building designed following top standards
The Artemis is on 8.956m2 floor area, the building area is 4.717,3m2. In the south of downtown Hanoi with 4 frontages: 02 Le Trong Tan’s frontages, 01 Truong Chinh’s frontage and another in Ton That Tung street, only 500m from Nga Tu So, The Artemis belongs to the most developing and busiest area of Thanh Xuan district. With golden location, The Artemis is shaped to be 28-storey buildings divided into 03 separate functions zones: commercial centers, offices and luxury apartments with a total usable area 136 911 m2. The Artemis will be a model building with full-service of financial, commercial, service, culture, science and technology functions. It will be a new highlight point of city, contributing to the gentrification process, creating momentum for developing strongly in the south Hanoi. This land is recognized as a rare "economic oasis" by experts.
 
 

Overview of The Artemis
 
All systems of the complex are attached special importance right from the beginning of design. The overall design in general as well as the design of M&E system in particular are the balance between modernity, luxury and green environment for households and users, thereby creating natural lighting spaces, adequate ventilation system ...
Being considered as one of the most anticipated projects in 2016, with the total investment of VND 1,000 billion, the overall M&E works of The Artemis are implemented by Sigma Engineering, including but not limited to parts as: water supply, fire protection, substations, low voltage power supply, HVAC system, lighting system, fire alarm system, communication system, security camera system, lightning protection system, aircraft lighting system vv.. We planned to mobilize nearly 600 Sigma’s engineers, technicians and workers involving to meet the tight deadline of just 8 months for total 136.911m2 area.
Sigma has worked closely to investors and leading consultants such as Artelia project management (France); Apave monitoring unit (France), Delta construction company ... to actualize The Artemis’s beauty of design and quality according to ISO 9001-2008.

(Project development teams)
  Caste facilities at The Artemis

RELATED INFORMATION
INFORMATION ON PROGRESS
REWARD INFORMATION
SAFETY INFORMATION

Other projects

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49