Updated progress of Home City Complex Hanoi project

05/07/2016

After nearly a course of year designing and deploying mechanical & electrical system for Home City complex, Sigma has entered in the final stage and prepared to hand over at the end of 2016. Currently, M&E work has been completed about 80%. With professional and methodical approach, Sigma commits to finishing our mission on schedule.

 
Phối cảnh tổng thể nhìn từ hướng đường Trung Kính

(Overall site view)

Located in the center of Cau Giay district’s developing urban, Trung Kinh Complex (or Home City) is a complex zone including four mixed residential-commercial buildings 25-30 storeys with total floor area 15211m2. There are several types of apartment from 61.4-114m2, it’s expected that, this project could supply for the demand of 3.400 residents after being finished.

 
Chung cư Trung Kính Complex - Nhiều tiện ích vượt trội

Trung Kinh Complex – Outstanding utilities

 

Chung cư Trung Kính Complex - Khu bể bơi tiện lợi cho cư dân

The details of finishing tasks as follow:

Infrastructure package for X1A ~ X30; Y19 ~ Y20 axis area (internal road surface Nguyen Viet Xuan School) has completed over 95%; steel-pipe drainages for tree tubs, protection sleeves for water supply pipeline, protection sleeves for lighting wires will be completed before one week finishing the road to ensure preserved conditions. X1A ~ X30; Y1A ~ Y2 axis area (internal road surface Petroleum Institute) has completed 75%, our workers are now carrying out the excavation, compaction, making the installation of uPVC system vv. We have finished approximately 70% in such sections: installation of concrete pipelines, installation of uPVC pipelines in X27~X30;Y1A~Y20 axis area (internal road surface Trung Kinh street). Inside house work (installation of uPVC pipelines) has been finished about 90%.

M&E package was proceeded from 25/08/2016 and was scheduled for completion on 12th, October 2016. Up to now, we have finished 80-100% sections such as: water supply pipes, Conduit HL pipes, chimney flues, fire protection pipes, vertical ladders, busway, lightning protection Roof etc .. in A1, A2, B1, B2 towers, basement and roof deck.
Other tender packages such as Busway package, Station Transformer package, Fire Protection Package are carried out synchronously to ensure the progress of the project.

IMG_3037.JPGIMG_3086.JPG
(Installing ventilation equipment)
IMG_3064.JPGIMG_3060.JPG (Installing water collector shafts conditioning condenser T4-A2)


(Installation of fire alarm module cabinet hyphen) 

(Monitoring installation of electrical cabinets for apartments)
   

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49