Expanding the scope of work in Nghi Son Refinery and Petrochemical Complex

02/07/2016

In September 2014, Sigma was appointed to be M&E contractor for Nghi Son Refinery and Petrochemical Complex project (total investment more than 9 billion USD) with the package supplying and installing mechanical & electrical systems for BLD-4 package, zone 2, the region A600 / AA00 / AB00 / AD00. 

This is one of the most complex M&E projects because the Refinery and Petrochemical Complex project needs high capacity with high accuracy to ensure the need of national energy. Sigma completed successfully the M&E system for BLD-4 package, zone 2, the region A600 / AA00 / AB00 / AD00 and put into testing & commissioning period. We complied with all of strict requirements on safety, quality and especially high level of expertise in the application of international standards for electrical systems equipped to the oil refinery plant.


 
Besides, Sigma continues implementing arising work package here (5/2016-8/2016) with the following items:
  • Fire Alarm System in Extrusion shelter house (7 stories)
  • Lightning Protection, Earthing System in Solid warehouse (30,000m2 roof area)
  • CATV, MATV System, 04 CCTV in Substation Process house(SSP)
  • Replacing rack system for central air-conditioning part of the SSP above, according to the new design
Sigma has coordinated and worked closely with IPMT representative investor, JCG contractor , conditioning equipment and engines issuer representatives, cabinets and control cabinets issuer representatives, and other contractors to complete the project in the best status. Sigma committed to completing M&E system of the project according to the most rigorous standards by the most perfect way.
 

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49