As the unit in charge of maintaining the mechanical and electrical systems (MEP) of Ba Dinh Office Building, Sigma has clearly affirmed its important role in maintaining the stability and efficiency of the entire key technical system. With extensive experience in construction and maintenance of large projects, Sigma has brought a professional, methodical maintenance process that is suitable for the operating standards of a Class A+ office building in the heart of the capital.
Overview of Ba Dinh Office project
Since taking over the task, Sigma has deployed a team of experienced engineers and technicians, well-trained in maintaining systems such as: medium and low voltage electricity, lighting, air conditioning - ventilation (HVAC), water supply and drainage, fire protection, low voltage electricity (ELV) and elevator systems. Periodic inspection and maintenance work is strictly carried out according to technical standards, ensuring that the system always operates in optimal condition, minimizing risks and technical incidents.
Sigma also actively applies technology to maintenance work, through connecting to the BMS (Building Management System), helping to monitor, control and warn of incidents accurately and promptly. Technical data is stored, analyzed and used to provide predictive maintenance solutions, instead of just stopping at periodic maintenance or when incidents occur.
Not only performing well in technical roles, Sigma's maintenance team also always demonstrates professionalism in working style: responding quickly, supporting residents and tenants of the building with a dedicated and polite attitude. Thanks to that, Sigma's image is always associated with reliability and outstanding service quality.
Sigma's presence at the Ba Dinh Office Building project not only contributes to ensuring the smooth operation of the building, but also clearly demonstrates the capacity to manage and maintain MEP systems in key, complex projects that require high expertise.