BA DINH OFFICE BUILDING

  • CLIENT: PHU MINH INVESTMENT LTD
  • PROJECT LOCATION: 19 LE THANH NGHI, HAI BA TRUNG, HANOI
  • SCOPE OF WORKS: MAINTENANCE ME SYSTEMS
  • CONTRACT DURATION: 21/10/2023 - 21/10/2025

Project detail

As the unit in charge of maintaining the mechanical and electrical systems (MEP) of Ba Dinh Office Building, Sigma has clearly affirmed its important role in maintaining the stability and efficiency of the entire key technical system. With extensive experience in construction and maintenance of large projects, Sigma has brought a professional, methodical maintenance process that is suitable for the operating standards of a Class A+ office building in the heart of the capital.


Overview of Ba Dinh Office project

Since taking over the task, Sigma has deployed a team of experienced engineers and technicians, well-trained in maintaining systems such as: medium and low voltage electricity, lighting, air conditioning - ventilation (HVAC), water supply and drainage, fire protection, low voltage electricity (ELV) and elevator systems. Periodic inspection and maintenance work is strictly carried out according to technical standards, ensuring that the system always operates in optimal condition, minimizing risks and technical incidents.

Sigma also actively applies technology to maintenance work, through connecting to the BMS (Building Management System), helping to monitor, control and warn of incidents accurately and promptly. Technical data is stored, analyzed and used to provide predictive maintenance solutions, instead of just stopping at periodic maintenance or when incidents occur.

Not only performing well in technical roles, Sigma's maintenance team also always demonstrates professionalism in working style: responding quickly, supporting residents and tenants of the building with a dedicated and polite attitude. Thanks to that, Sigma's image is always associated with reliability and outstanding service quality.

Sigma's presence at the Ba Dinh Office Building project not only contributes to ensuring the smooth operation of the building, but also clearly demonstrates the capacity to manage and maintain MEP systems in key, complex projects that require high expertise.

Other projects

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn50
pn52
pn53
pn54
pn55
pn57
pn58
pn59
pn60
pn61
pn62