On this sacred path, a service, tourism and festival center is being built to connect with the natural landscape and serve the development of tourism, meeting the needs of religious culture in the time. It is expected to be completed and operational before the Spring Festival 2018.
Realizing the importance of being considered one of the key cultural projects of the locality, M&E Contractor of the project - Sigma Engineering has been all efforts to accelerate the progress of projects in the main areas such as hotel blocks, restaurants, out-of-home areas, pilgrimage ... Last week, from 18/11 to 25/11/2017, typical works were being deployed at the project such as:
- Electrical works:
- Construction of the hotel area:
- Installation of conduit for the electrical systems on floors 1,2 at the apartment area
- Installing conduit and wiring for light electrical system on 1st and 2nd floor
- Wiring for electrical system, light electrical system on 1st and 2nd floor
- Installation of conduit for electric corridors, light corridors on the 2nd floor
- Installation of electrical switchboards
- Construction of P1 area:
- Installation of conduit pipe, wiring for fire alarm, light electricity
- Installation of sound box for landscape lights
- Installation of electrical switchboards
- Construction of P5, C2, out-of-house and pilgrimage area:
- Install conduit for electrical system
- Install conduit pipe and wire rope for light electrical system
- Pull the electrical system, light electricity
- Install cable ladder, cabinet
- Mechanical works:
- Construction of basement system - C2 & C3
- Execute fire extinguishers, fire cabinets, fire pumps
- Align the fire tube
- Installation of wind Basement C3, ventilation
- Construction of Chiller system
- Executing the mechanical system 1 of P1
- Construction of copper pipe, wind pipe
- Install FCU, outdoor unit
- Construction of hotel room C2 & C3, P5, machine room, restaurant, ball room:
- Construction of Chiller pipe system, fire fighting
- Pipelines, fire valves, fire cabinets
- Construction of air duct system, FCU, steel pipe, condensate drainage pipe
Here are some photos of the project last week:
Overview of Yen Tu project
Tool Box Meeting daily at the project
Execute the HVAC system at the roof of Ballroom / Fire Extinguisher in P5 tunnel
Construction of the pump room at the project