Started construction on an area of 20,000 m2 in Duong To Commune, Phu Quoc District, Kien Giang Province, Dusit Princess Moonrise Beach Resort is embraced by Phu Quoc Island, bringing modern breath to the wild and romantic spot. Besides many excellent contractors participating in the project such as Duong Dai Architects (Design Architects), Sigma has brought the vitality to the whole project through the installation of M&E system for all 108 rooms at Moonrise.
In order to keep up with the progress of hand-over at the end of this year, Sigma is making every effort to speed up the progress while ensuring the quality to bring the best products to the customers. Last week, from 22/10 to 28/10/2017, the following main works were being executed by Sigma:
- Installation of water supply pipelines, acceptance of test pressure, sealed test
- Installation of drainage pipes, submersible pumps, sealed test
- Installation of firefighting pipe, test pressure test
- Installation of the main cabinet, main cables
- Installation of distribution cabinets
- Connecting cables to the blocks
Some pictures of the project last week:
Overview of the Dusit Princess Moonrise Beach Resort
Tool Box Meeting daily at the project
Connecting the electrical substation at the project
Completing the pump room at the project
Cleaning the MSB cabinet