When referring to Hai Phong, people will immediately think of the street with full of flamboyant and the ships docked back and forth. Not only that, Hai Phong is a potential land to attract the investors in and outside the country with the "majestic" real estate project in this place.

Being like the "heart" of Hai Phong city, SHP Plaza is emerging with 28 floors high in the center of the city. Located on the busy Lach Tray Street, SHP Plaza converges the highest standards of living as a 6-storey commercial center with world-class fashion and food brands, 247 serviced apartments with the international standard lighting and M&E system as well as other facilities such as gym, conference room, swimming pool, spas…to improve the living quality for the residents here.
Owning the management team with highly qualified engineers, experts and skilled workers, Sigma received the trust from the investor of SHP Plaza Hai Phong – Asia Chemical & Paint Real Estate JSC to become the general contractor of the project. Over the past two years, the M&E works of the project have been gradually completed. Last week, from 5/10 to 12/10/2017, the typical works in the project were being implemented such as:
  • Electrical works
    • Wiring cable at staircase No.4
    • Install generator chimney
    • Wiring cable at the 1st floor
    • Install cable tray for heat pump room
  • Plumbing works
    • Install valve for plumping system at 5th, 5M, 6th floor
    •  Install gray cast iron 4th floor zone 2
  • HVAC works
    • Install duct at 4th floor zone 2
    • Install Condensate at 8th floor zone 2
    • Marking on ceiling for air grille, lighting, sprinkler head at 2nd floor zone 2 & zone 1, 3rd floor zone 3, 4th floor zone 2
    • Cleaning for FCU, air duct…at podium area
    • Install OA duct, air box & flexible duct at zone 1 of 5th floor
  • Fire Fighting works
    • Install prepare pipe for sprinkler at 2nd ~ 5th mezzanine floor
Here are some photos at the project:
 

Overview of SHP Plaza Hai Phong


Tool Box Meeting daily at the project


The materials at the storage were arranged neatly


Wiring electrical cable/ fire pipes and install Conduit from 9th – 12th floor at the hotel area

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49