Updated progress at The Golden Palm project in the 3rd week

27/10/2017

Located at the foot of the Lang Ha flyover and on Le Van Luong street, the arterial road connects to the center of Hanoi, The Golden Palm commercial, office and residential complex was standing out with two 27-storey towers, highlighting the city’s features.

Designed with the size of two towers A and B, each tower at The Golden Palm will comprise 11 apartments/ floors and apply the most advanced design in the world. With the creation of the open space, each apartment at The Golden Palm will receive natural light and atmosphere, saving energy and creating a proximity to nature.
Investor of the project – Hanoi Sunrise Investment Development JSC has gathered prestigious contractors to implement this project such as: CENINVEST (investment cooperation), DELTA (construction contractor), EDEN (design consultant) and SIGMA (M&E Contractor) ...
Having been affirmed prestige from a series of key projects all over the country, HDIS shook hands with Sigma to bring the construction to life. More than anyone else, Sigma always understands that every successful project will be a solid foundation for building trust not only with the owner but with the future residents when living in the home that Sigma contributes to.
Last week, the main works being deployed at The Golden Palm include:

 
  • Electrical system:
  • Executing temporary electrical system on the 23-27th floor and basement
  • Wiring the lighting cables at the stairs of tower A and B
  • Executing the conduits of 25-27th floor at the apartment area
  • Constructing the conduits, pulling cables and installing equipment at the nursery area
  • Constructing the conduits, pulling cables at the lobby area, basement of tower A and B
 
  •  Water supply and drainage system:
  • Installation of sleeve under floor in the roof area
  • Installation of water supply and drainage system of tower A, B                                                                                                                                                                                                                                           
  •  HVAC system:
  • Constructing the condensate line of 24-26th floor at tower B
  • Constructing the windpipes of 24,25 floor at tower B
  • Constructing the windpipes of 2, 3 floor at tower B
Some pictures of the project last week:
 

Overview of The Golden Palm project
 
 
Tool Box Meeting daily at the project

 

Materials are arranged in the separate compartments



Wiring electrical cables of the corridor of the 1st floor

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49