Located at 265 Cau Giay, FLC Twin Towers is designed by the modern architects, based on creative ideas of a living space filled with green, with sunlight and wind to each apartment. 50 floors of offices and 420 apartments, with light, ventilation, abundant electricity and water supply which installed by Sigma will make every resident feel comfortable living and working at FLC Twin Towers.
Last week, although the temperature has dropped sharply, the staff in here were still trying to accelerate the progress and quality as committed to the owner. Main works were being
- Department building:
- Embedded conduits and plumbing work completion) from 7th floor to 27th floor and 29th ~45th floor
- Inspection of wiring work and hand over from 7th floor to 27th floor
- Inspection of wiring work and hand over from 29th floor to 45th floor
- Finalization of water drainage pipe on technical level 28th floor
- Inspection of wiring work and hand over wiring work from 7th floor to 27th floor and from 29th floor to 45th floor
- Completion of wiring work from 43th floor to 44th floor
- Basements:
- Completion of floor drain work at basements 2, 3 &4
- Installation of water supply system for cleaning at basements 2, 3 &4
- Completion of lighting cabling work at basements 2, 3 &4
- Completion of embedded conduit for lights at Basement 1
- Office building and Commercial center
- Completion of civil work from 7th floor to 11th floor
- Completion of 12th floor and 13th floor
Here are some photos of the project:
Overall persepctive of FLC Twin Towers
Tool Box Meeting daily at the project
Installation of Chiller systems
Aligning, installing water supply and drainage systems