Updated M&E progress at The Golden Palm project in the 3rd week

24/01/2018

In the joyful atmosphere, when the Lunar New Year is approaching, at every project that Sigma has become the Main M&E Contractor, everyone is trying to finish the old year to prepare for a new year with the things better. At The Golden Palm is also the same, although the project less than 500m from the Head Office, the working atmosphere in here is bustling and hustle. 

Two 27-storey towers rose up on Le Van Luong Street, Thanh Xuan District, Hanoi, one of the most developed areas in the capital which has many offices, administrative workplaces. Along with the civil works, Sigma JSC is pushing M&E works of the project, meeting the quality and progress as committed to the investor.
Last week, from January 14th to January 21st , The Golden Palm is focusing on the following works:
  • Water supply and drainage system
    • Installation of riser and flow meter  
    • Installation of storm water drainage pipeline
    • Coordination with other subcontractors for equipment
    • Installation and remedying defects.
    • Installation of pressure valves for riser
    • Water drainage pipe installation at basement 
    • Basement pump room installation
    • Installation of chimney for generator room
    • Basement water drainage pipe installation
    • Basement pump room installation
    • Installation of chimney for generator room
  • Lighting system
    • Installation of orridor lighting system
    • Installation of department distribution switchboard
    • Distribution switchboard installation in riser
    • Riser cabling work
    • Conduits and sockets installation on 1st floor
    • Lighting cable pulling work on 6th floor of commercial center
    •  Lighting cable pulling work on 3rd-5th floors of commercial center/ commercial building
    • Cable tray and cable ladder installation at basement of commercial center
    • Busway system installation
  • HVAC system
    • Department
    • Loggia’s louver installation
    • Copper tube welding and cooperation with suppliers for equipment installation
    • Installation of exhaust fan in toilets
    • Commercial building and basements
    • Duct installation at commercial center
    • Louver installation at commercial center
Here are some photos of the project last week:

Overview of The Golden Palm

 
Tool Box Meeting daily at the project


Ceiling conduit installation at commercial center


Installation of corridor recessed lights​


Installation of department distribution switchboard

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49