Two 27-storey towers rose up on Le Van Luong Street, Thanh Xuan District, Hanoi, one of the most developed areas in the capital which has many offices, administrative workplaces. Along with the civil works, Sigma JSC is pushing M&E works of the project, meeting the quality and progress as committed to the investor.
Last week, from January 14
th to January 21
st , The Golden Palm is focusing on the following works:
- Water supply and drainage system
- Installation of riser and flow meter
- Installation of storm water drainage pipeline
- Coordination with other subcontractors for equipment
- Installation and remedying defects.
- Installation of pressure valves for riser
- Water drainage pipe installation at basement
- Basement pump room installation
- Installation of chimney for generator room
- Basement water drainage pipe installation
- Basement pump room installation
- Installation of chimney for generator room
- Lighting system
- Installation of orridor lighting system
- Installation of department distribution switchboard
- Distribution switchboard installation in riser
- Riser cabling work
- Conduits and sockets installation on 1st floor
- Lighting cable pulling work on 6th floor of commercial center
- Lighting cable pulling work on 3rd-5th floors of commercial center/ commercial building
- Cable tray and cable ladder installation at basement of commercial center
- Busway system installation
- HVAC system
- Department
- Loggia’s louver installation
- Copper tube welding and cooperation with suppliers for equipment installation
- Installation of exhaust fan in toilets
- Commercial building and basements
- Duct installation at commercial center
- Louver installation at commercial center
Here are some photos of the project last week:
Overview of The Golden Palm
Tool Box Meeting daily at the project
Ceiling conduit installation at commercial center
Installation of corridor recessed lights
Installation of department distribution switchboard