Saigon is going through a very difficult and rushed period when it must fight against the 4th wave of COVID-19. But in Saigon, there are stories that are very ordinary but still sparkling and fragrant. It is the shrill voice of street vendors, sharpening scissors, the image of an old mother carrying her children, raising her grandchildren, an old knowledgeable uncle playing the role of a motorbike driver... or simply photos of Sigma workers who "breathe" the soul to Sunshine Diamond River project to keep up with the set schedule...

Located right on Dao Tri street, adjacent to Phu My Hung and Saigon Peninsula urban areas - Sunshine Diamond River is known as a residence for the "upper class". When people become the center and mainstream, all infrastructure, works, architecture, services, and amenities are calculated, aiming to serve their owners in the most perfect way. In other words, the special thing about Sunshine Diamond River lies in every extremely small detail, such as the smart parking system combined with the resident support application, the elevator to select the destination face ID, the system Free Wi-Fi system that covers the whole urban area... in line with the development of the 4.0 era.

It can be said that Sunshine Diamond River fully converges the quintessence that very few projects can touch. Under the hands of Sigma workers, the project promises to attract many residents as soon as it comes into use. Currently, M&E works were being implemented at the project such as:
  • Electrical system
    • Apartments and corridors:
      • Construction of conduit for apartment areas and corridors
      • Wire and cable pulling at the apartment area and corridor
      • Construction of outdoor cable tray ladder at 29th floor, roof top
    • Basement area, podium:
      • Basement: complete lighting system, switches, sockets...
      • Electrical technical shafts and technical rooms
      • Installation of electrical cabinets
      • Axial cable pulling
      • Installing the outside electrical system
      • Medium voltage power supply for the project
  • HVAC system:
    • Basement:
      • Installing air conditioners in technical rooms, basement elevator lobby
      • T&C air conditioner, fan
    • Base block:
      • Installing air vents, ceiling fans, louver
      • T&C air conditioner, fan
    • Apartment part:
      • Installing ceiling fans in toilets, vents
    • Corridors, stairs:
      • Installing stair louvers
      • Installing air valve for garbage room
      • Installing smoke exhaust vents, air conditioners in the lobby
    • Roof:
      • Installing of ducts, air valves
      • Installing ventilation fans
      • Installing the elevator lobby air conditioner outdoor unit
    • Water supply and drainage system:
      • Installing the water supply and drainage system in the apartment area
      • Installing water supply and drainage system in technical axis area
      • Installing water supply and drainage system in the roof area
      • Installing sanitary equipment
Pictures of Sunshine Diamond River project:

Overview of Sunshine Diamond River project

 
Materials at the storage is neatly organized

 

Temperature control for workers before working at the construction site


Installation of electrical cabinet

 
Acceptance of wall area of 8th and 9th floor on Tower C


Working atmosphere at the Sunshine Diamond River site office

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49