M&E installation phase at 16 Lang Ha project

15/05/2021

Besides the projects of factories, wind power plants, hospitals, schools, etc., apartment complexes and high-rise houses are still one of Sigma's strengths. We bring perfect solutions in the design and build of M&E systems that require expertise and high skills.

At the end of February 2021, Sigma excellently surpassed many famous contractors to continue to be named as the Main M&E Contractor of the 16 Lang Ha office, apartment and villa complex project. Our works include, but are not limited to work such as: Documenting shop drawings, supply and construction of M&E systems for offices and banks.

16 Lang Ha project owns a smart design, with multi-style apartments, suitable for the aesthetic needs of each customer. Professional designers have created fresh living spaces. The project has a scale of 4 22-storey towers, with a total planning area of ​​15,801 m2, invested by BRG Group.

Up to now, according to the progress, the works under construction at the project include:
  • Water supply and drainage system:
    • Construction of technical shaft for drainage
  • Electrical system:
    • Construction of the cable tray system on the 11th floor of the office block
    • Get marks on the 12th and 13th floors
 

 
TBM daily at the project


 

Fire safety instructions at the project


Material acceptance

 
Check the shop drawings/ Cable tray ladder installation


Laying out electrical conduit

 
Materials at the storage are neatly arranged

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49