The project consists of two floors, located at Lot CN-07, Van Trung industrial park, Van Trung commune, Viet Yen district, Bac Giang province. Built on a total area of 4,589 m2 and continuously constructed within 6 months, once completed, the project promises to become one of the European standard high-tech board factories.
With abundant financial resources and Sigma's highly qualified and professional staff, up to now, many items have been and are in the process of being completed. Specifically like:
- Create a punch list
- Testing & Commissioning
- Fire alarm system
- Server system
- Access control system
- CCTV system
- PA system
- VRV/PAU/AHU air conditioning, Cool Room system
- Precision air conditioning system CRAC
- Gas fire extinguishing system FM200, Sprinkler
- Waste water treatment system, compressed air system
- Gas system O2/N2/Argon/CH4
Here are some photos of the project:
Synergie CAD factory project in the finishing stage
T&C water supply & fire protection system
T&C fire protection system
T&C Air Conditioning systems
T&C server systems
T&C compressed air systems