Progress of M&E construction at Sunshine Riverside project in the 21st week

28/05/2019

Highlighting at the foot of Nhat Tan Bridge, Sunshine Riverside is one of the outstanding projects of Sunshine Group. Located on Vo Chi Cong street, Sunshine Riverside possesses a beautiful location. From here, the owner of each apartment can zoom in to see Nhat Tan Bridge - one of the most beautiful cable-stayed bridges in Vietnam and is gradually becoming a new symbol of the Capital.

 
Sunshine Riverside project appeared prominently at Nhat Tan Bridge
 
The peaceful land of Phu Thuong used to be known for its famous peach garden. Here, each one will be immersed in the poetic space by a romantic West Lake, Nhat Tan bridge shimmering at night and poetic Red River creates a green and peaceful space right in the middle of crowded urban.

The Sunshine Riverside apartment complex, which combines high-end commercial service, gradually emerged with three residential towers, including an international school, an entertainment center serving the community and the natural landscape. With the design solutions for sustainable architecture and M&E, at the hands of talented Sigma workers, Sunshine Riverside promises to become an upscale and classy living space for urban people.


More than anyone, Sigma – the M&E Contractor of the project understands the motto that the owner wants to send: "All for a comfortable life". Therefore, although it has entered the handover stage, Sigma is always meticulously executed for each system, the smallest error has been thoroughly fixed by us, committing to bring the best products to be sent to the customers.

Last week, Sigma maintained the number of 20 engineers and more than 100 workers to ensure the progress of the project. The main works have been implemented such as:
  • Apartment area:
    • Complete handover of apartments to the customers
  • Commercial center area:
    • Receive the shop drawing to complete the commercial center area.
Some photos of the project:
 

Sunshine Riverside shimmered in the night sky

 
TBM daily at the project

 

 
Materials at the storage are divided into separate systems and neatly reinforced

   
Pulling cable on the 30th floor / Testing socket on the 20th floor

 
Acceptance of fire protection system of the building

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49