Updated the progress of D.’ El Dorado project in the 9th week

07/03/2019

Designed and built by Tan Hoang Minh Group on the "diamond" land west of Hanoi City, D’. El Dorado project can be considered as one of the rare projects left in the West Lake area, bringing together the precious elements such as a prosperous location with a shape of a dragon; close to the lake to enjoy fresh air and the “new classical” design. D.’ El Dorado receives special attention from anyone who wishes to have a romantic but bustling life on the West Lake.

Officially started from the end of 2017, D '. El Dorado is a project consisting of 27 floors and 4 basements with European architecture. Along with that, the style of smart apartment design, according to modern orientation, has received the love of customers right from the launch. Thanks to the determination of the Investor - Tan Hoang Minh Group and the urgency, seriousness and safety of the Main M&E Contractor – Sigma Engineering, after a year of construction, the project has always constructed beyond the set schedule and gained an absolute trust from the customers.

2019 promises to be a difficult and challenging year, but with Sigma's growth and development, nothing can stop the brave warriors moving forward. With the total number of personnel maintained at over 100 engineers and workers, the main items were being implemented at the project last week such as:
  •  Electrical works:
    • Construction and installation of pipes at Basement 2, 3, 4
    • Fire alarm installation from level 4 to 20
    • Cable tray ladder installation on level B4, 25
    • Electrical cable pulling for fire alarm from level 4 to 20
  • Mechanical works:
    • Water supply pipe installation from level 4 to 24
    • Water drainage pipe installation basement 3
    • Water drainage system installation of apartment area from level 6 to 25
    • Installation of HVAC duct at basement 2,3,4
    • Installation of HVAC duct at the corridor area from level 4 to 26
    • Fire fighting installation at basement 2, 3, 4
    • Installation of sprinkler for basement 2, 3, 4
Some photos of the project last week:

 

 
Overview of D'. El Dorado project

 
TBM at the project

 
Drainage shaft closing at level 26/ Plastering work at level 23

  
Electrical cable pulling at level 13/ Conduit installation at level 25

 

Plastering work

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49