Officially started from the end of 2017, D '. El Dorado is a project consisting of 27 floors and 4 basements with European architecture. Along with that, the style of smart apartment design, according to modern orientation, has received the love of customers right from the launch. Thanks to the determination of the Investor - Tan Hoang Minh Group and the urgency, seriousness and safety of the Main M&E Contractor – Sigma Engineering, after a year of construction, the project has always constructed beyond the set schedule and gained an absolute trust from the customers.
2019 promises to be a difficult and challenging year, but with Sigma's growth and development, nothing can stop the brave warriors moving forward. With the total number of personnel maintained at over 100 engineers and workers, the main items were being implemented at the project last week such as:
- Electrical works:
- Construction and installation of pipes at Basement 2, 3, 4
- Fire alarm installation from level 4 to 20
- Cable tray ladder installation on level B4, 25
- Electrical cable pulling for fire alarm from level 4 to 20
- Mechanical works:
- Water supply pipe installation from level 4 to 24
- Water drainage pipe installation basement 3
- Water drainage system installation of apartment area from level 6 to 25
- Installation of HVAC duct at basement 2,3,4
- Installation of HVAC duct at the corridor area from level 4 to 26
- Fire fighting installation at basement 2, 3, 4
- Installation of sprinkler for basement 2, 3, 4