Updated progress at MB Grand Tower project in the 24th week

16/06/2018

A Grade-A building - the headquarters of the MB Bank, is gradually emerging on Le Van Luong street, named The Commercial, Hotel and Apartment for rent MB Grand Tower.

Located at 63 Le Van Luong, built on a total land area of ​​4,950 m2, the MB Grand Tower project will meet the working space requirements for more than 2,000 staff of MB Bank, bringing a new breath of a modern office building, professionalism, utility, difference, become an artisan gateway to the West of Hanoi, the interference between the sophistication of Japanese architecture and the cultural characteristics of Vietnam.

Well invested from the planning and selecting contractors to participate in the project, the investor - MB Land JSC wisely called the name of the consultant - Nihon Sekkei, Construction Contractor - Coninco and The Main M&E Contractor - Sigma to implement the project. With more than 13 years of experience, Sigma is confident that M&E works will meet the expectation of the owner. With a staff of nearly 40 employees and 14 engineers on site, MB Grand Tower is dedicated to achieving the committed progress.

Last week, from 07/06 - 14/06/2018 the project was implementing the main works as follows:

  • Installation of conduit, cable tray ladder, drainage pipe, fire alarm system from basement 3 ~ mezzanine
  • Wiring work, FA, PA, CCTV, BMS from basement 3 ~ mezzanine
  • Installation of Busway
  • Installation of conduit, conduit, cable tray, drainage pipe, fire protection pipe, duct and insulation from the 1st to the 25th floor.
  • Installation of copper pipes and insulation from the 1st to the 25th floor
  • Wiring work, FA, PA, CCTV, BMS, LAN, TEL from the 1st to the 25th floor

Some pictures at the project last week:

 

Overview of the MB Grand Tower project


 
Sigma engineers at the site office of MB Grand Tower project


 
Materials in the storage were cleanly arranged in a clear system



Tool Box Meeting daily at the project


 
Executing the copper pipe on level 10/ Installing duct on level 9





Fabrication of the fire extinguisher on the 1st floor

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49