Operating under the model of a general hospital, the hospital provides most of the medical examination and treatment services for all common medical problems. With more than 110,000 medical examinations and more than 25,000 births per year, the Hanoi French International hospital is a reliable and reliable place for Vietnamese and foreign communities to live and work in Vietnam.
In order to meet the demand for medical treatment with these figures, the Hanoi French international hospital project was upgraded and expanded in two phases: building a new seven-storey building next to the existing one and renovating, upgrading the existing hospital building.
Officially launched in 2010, the project owner, has selected the prestigious contractors to implement this key project. Virtually gained the trust from the investor, Sigma Engineering JSC – The M&E Contractor have made great efforts to implement Package 3: Mechanical and Electrical works of the project. With experience in project implementation, highly skilled workers and engineers, Sigma is committed to bringing the project to the right track.
Last week, from May 28th to June 3rd, Sigma maintained stable human resources at 140 workers and 14 engineers, the main works were as follows:
- Electrical works:
- Wiring work from level 2 to level 4
- Conduit installation on gypsum wall level 4, 5
- Conduit installation on brick wall level 6, 7
- Installation of medium voltage cable
- Mechanical works:
- Installation of fire pump on level
- Painting the fire sprinkler pipes on level 3
- Installation of fire system at the staircase
- Installation of FCU, insulation on level 2-3
- Completion of mock-up room: hallway, stairs, sample clinic