Updated progress at West Bay Sky Residences

06/01/2017

Implementing at the end of August 2016, Sigma carried out package of all materials, installation and maintenance M&E system of Tower A & Tower B of West Bay Sky Residences with total floor area of 3,000 m2. Since taking over the project, the project’s steering committee is attempting to complete the works and reconfirming Sigma reputation in providing M&E service for commercial complex, offices and residential apartments.

After more than four months of construction, the project’s steering committee is urging the engineers and workers in order to accelerate the construction, while continuing to ensure the progress and commitment to the investor. Until now, in the Tower A and B, many categories of M&E systems at the project has been 100% completed, such as:                              
  • Install PVC conduit in floor, through floor at 11~26 floor
  • Peel the sleeve pipes in floor at 11th,12th floor
  • Unclog and drag the Conduit at 11th floor
Besides, some categories are also urging to complete, such as:
  • Install PVC conduit in floor, through floor at 24th floor
  • Install M&E system at 3rd floor
  • Install PVC conduit in floor, through floor at 27th floor
  • Construction of a new permanent office at 1st floor
Here are some photos of West Bay Sky Residences:
    

   

   
 

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49