The expeditious atmosphere at New Horizon City project in the 52nd week

03/01/2017

Currently at New Horizon City project, assuredly everyone will feel the heat of working atmosphere here. From the project manager to the frontline worker, all are trying to accelerate the construction schedule to handover to the customer in January 2017. Implementing from 10/2014, presently, most of M&E works at the project has been completed 100%.

The project’s steering committee is attempting to complete the remaining works. In the first two weeks of 2017, the project is focusing on the following tasks:
  • Installing electrical system:  installation of Electrical Cabinet 1,2; lighting system at Tunnel 1; installation of medium voltage cables; installation of cable tray at Tower N02; drag fire alarm cables, speaker cables at Tower N03, HH01; cut chisels and install conduit pipe in sound wall at Tower HH01.  
  • Installing plumbing system: installation of drainage pipes, ventilation, check the drainage tube leakage; waterproofing drainage tube for apartments, installation of water supply pipes in the ceiling apartments; cut chisels and insert water supply; installation of pumping equipment in van, alignment of drainage pipes at Tower N01, N02, N03, HH01.
  • Installing fire system: installation of fire mains, fire pipeline pressure testing; installation of fire valves, installation of equipment and cabinets fire nozzles at Tower N01, N02, N03 and HH01.
  • Installing the ventilation system: construction and installation of the wind pipe, installation of ventilators at Tower N01, N02, N03 and HH01.
Some photos at New Horizon City project:
 
   

   

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49