Through each project, Sigma Engineering is constantly confirming the superior service quality over its competitors. Honored to deploy M&E works since 08/2015, Sigma is still completing the project on schedule, deserve the trust from our partners. Last week, the project was initially implemented the following works:
- Electrical system:
- Install lights, speakers for apartment area on 18 – 19 floor
- Install and modify pipes, fire alarms on B2 floor
- Install conduit, switches, sockets on the ground floor
- Install electrical cables for heating pump
- HVAC system:
- Install HVAC ducts, air conditioners on the ground floor
- Install ventilation ducts on B2 floor
- Install air vents on 17th – 18th floor
- Installation of air ducts, air conditioner on 4th floor
- Water supply system:
- Install water meter clusters on the 15, 16, 17, 18 floors
- Testing the central hot water supply system on the roof
- Testing water system on the 23, 24th floor
- Install drainage at apartment area on 10-13th floor
- Fire protection system:
- Locate the fire alarm on the 5th floor
- Install fire cabinet, pressure testing, installation of spray sprinkler on B1, B2 floor
- Main axial pressure test
- Testing the fire pumps
Here are some photos at the project:
Installation of equipment on the ceiling
Installation of air conditioning on the 4th floor Installation of lighting systems on B2 floor