Over the past few days, the North has been experiencing an unpredictable weather with suns and rains, and suddenly, there are the heavy showers like the signal of the early summer. Summer, not only the season of the ticks, of flamboyant flowers but also of a “poetic” and “lovely” Hai Phong in the lyrics of Trong Tan artist:
“The May comes with the red flamboyant flowers
Hai Phong - our home city
I love our city as the most-loved one…”

The “poetry” and the “love” of Hai Phong seems to dispel the erratic weather in the early summer, to encourage the motivation of Sigma employees who are working in SHP Plaza here, help them work more enthusiastic, more zeal to keep up with the schedule as committed to the client.
After nearly two years of designing and deploying M&E works of the project, Sigma is still fulfilling its mission. Last week, from April 13th to April 20th, the typical works were being implemented such as:

Electrical system:
  • Wiring cable for generator room on the 1st floor
  • Wiring ELV & ELE at apartment area on the 10-16 floor
  • Install cable ladder for generator room on the 1st floor
  • Install cable ladder in riser
  • Complete the cable connection on the 5th floor
  • Constructing cable ladder for corridor on 23-24 floor
  • Install busduct in riser
  • Wiring cable at 15-16
  • Chip the 23-24 floor, zone 3
 Plumbing system:
  • Install water supply pipe at apartment area on the 17th floor
  • Install water supply pipe in wall at hotel area on the 19th floor
  • Chip, install water supply pipe at hotel area on the 20th floor
  • Install water drainage pipe at 22-23 floor
  • Install water supply pipe in riser
 HVAC system:
  • Pressure test for Chiller pipe on the 6th floor
  • Insulate, install ventilators on the 8th floor
  • Install Chiller pipe on the 5th floor
  • Constructing ventilators on the 18th, 19th, 22nd floor
 Fire Fighting system:
  • Install Firefighting pipe at apartment area on the 21st floor
  • Install Firefighting pipe at hotel area on the 20th, 21st floor
  • Install Firefighting pipe at hotel area on the 23rd floor.
Here are some photos of the project:
 
Overview of SHP Plaza Hai Phong

 

  

Installation of HVAC System
 
 
 

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49