Updated progress at Hanoi French International Hospital in the 32nd week

19/12/2017

The North is gradually entering the cold weather, many places where the temperature deep down makes all the movement becomes difficult. However, not so that the working progress in Hanoi French International Hospital project “freeze” when the “hard-working bees” still work diligently day and night to push the project finish on schedule.

With an outstanding capacity through many large-scale projects and high technical requirements, Sigma Engineering has won the trust of an investor as the contractor for M&E works including electricity, water, HVAC, fire protection for the entire project. With the purpose of expanding and upgrading from 68 to 180 beds to serve the medical examination and treatment locally and internationally, the investor of the project – L’Hopital Francais De Hanoi has chosen Sigma to become the Main M&E Contractor for this important project.
Up to now, M&E works of the project has always been completed on schedule. Last week, from 11 to 17/12/2017, the main works were being deployed as:
Electrical section:
  •  Installation of cable ladder at B2 Basement
  • Installation of cable ladder on level 2-4
  • Installation of cable ladder support on level 5
Mechanical section:
  • Installation of fire pump at B2 Basement
  • Installation of water drainage at B1, B2 Basement, level 2,
  • Installation of fire pump at B1 Basement, level 2
  • Installation of Chiller on level 2
  • Installation of water and air ducts in the mock up rooms
  • Installation of air duct support at B1 Basement
Some pictures of the project last week:

Tool Box Meeting at the project

 

Technical riser installation

 
Construction and installation of the air ducts in the mock-up rooms

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49