With an outstanding capacity through many large-scale projects and high technical requirements, Sigma Engineering has won the trust of an investor as the contractor for M&E works including electricity, water, HVAC, fire protection for the entire project. With the purpose of expanding and upgrading from 68 to 180 beds to serve the medical examination and treatment locally and internationally, the investor of the project – L’Hopital Francais De Hanoi has chosen Sigma to become the Main M&E Contractor for this important project.
Up to now, M&E works of the project has always been completed on schedule. Last week, from 11 to 17/12/2017, the main works were being deployed as:
Electrical section:
- Installation of cable ladder at B2 Basement
- Installation of cable ladder on level 2-4
- Installation of cable ladder support on level 5
Mechanical section:
- Installation of fire pump at B2 Basement
- Installation of water drainage at B1, B2 Basement, level 2,
- Installation of fire pump at B1 Basement, level 2
- Installation of Chiller on level 2
- Installation of water and air ducts in the mock up rooms
- Installation of air duct support at B1 Basement
Some pictures of the project last week:
Tool Box Meeting at the project
Technical riser installation
Construction and installation of the air ducts in the mock-up rooms