The appearance of Swire Cold Storage Vietnam in the 27th week

14/07/2017

The handover date will come in less than half of a month. The working atmosphere in the Swire Cold Storage Vietnam has become hotter than ever. All of Sigma engineers and workers here are working hard to accelerate the process, ready to handover to the investor in the near future.

Swire Cold Storage Bac Ninh is the second cold storage of the Swire Group in Vietnam with a capacity of 20,000 pallets and being expected to be built in 3 stages. Stage 1 consists of 6 rooms, 8,500 pallets. Swire Cold Storage Bac Ninh will be the most modern cold store in the north of Vietnam.
The Bac Ninh Swire Cold Storage had its ground breaking on 12th August 2016 at VSIP Bac Ninh Industrial Park, now, the M&E works of the project is coming to its final stage. The cold store is on track to go to the operation on the 1st August, 2017.
Sigma Engineering JSC became the Main M&E Contractor of the project on 12th December 2016. Since the implementation, Sigma has constantly received compliments from the investor for consistently adhering to the strict safety rules and regulations to put the project on schedule. From 10 July to 14 July 2017, the project was implementing the following works:
  • External sockets installation 
  • Electrical box connection in annex area 
  • Cable tray finalization in battery charge room
  • Wiring work on technical floor
  • Remedying defects of firefighting pipe  
  • External lighting installation 
  • Water drainage system installation on technical floor
  • Emergency lighting system installation on technical floor
  • Cable tray finalization in battery charge
  • Internet cable pulling on technical floor
  • External manhole construction
  • Wiring work at battery charge room
  • Camera installation in annex area 
  • Ducting work in utility building
Here are some photos of the project last week:
 

Overview of Swire Cold Storage Vietnam


Site office of Swire Cold Storage Vietnam

 
Tool Box Meeting daily at the project

 

Installation of solar system


Inspection of HVAC system/ Firefighting system with the consultant

 
Installation of lightening system


Sigma engineers at Swire Cold Storage Vietnam project

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49