Visiting New Horizon City project in the phase of preparing for handover

07/07/2017

To be known as the “Desirable Place, Desired Destination”, the spectacular estate complex New Horizon City has become very prominent at No.87 Linh Nam, providing residents with a perfect living environment in modern architecture, combined with a well-equipped system. With the strict requirement from the investor, the implementation of M&E system at the project always requires the highest safety and aestheticism.  Recognizing that issue, Sigma is still doing a good role of a main M&E contractor of the project, promising to make the project finished on schedule.

Nearly the handover date, the working atmosphere of New Horizon City project is hotter than ever.  The M&E works of the project are urgently deploying the final stage to be ready to handover to the investors. For projects requiring complex construction requirements in high-rise buildings such as New Horizon City, Sigma is committed will committed that the M&E works will ensure the quality of electricity, ensuring the frequency and voltage are within acceptable range; ensuring reliability, continuity in accordance with load requirements; M&E system is convenient for operation, assembly and repair as well as reasonable technical norms. Last week, from 25/06 to 01/07/2017, the works were being deployed as:

  • Implementation of fire alarm, CCTV, PA, electrical system at basement 1,2

  • Installation of fire alarm in tower N01, HH01

  • Installation of electrical system at corridors of an apartment area at the tower N01, N02, N03, HH01

  • Wiring PA, FA, CCTV, electrical cable, chipping central hall, elevator room in the tower N01, N02, N03, HH01.

  • Installation of equipment, switchboard in the tower N01, N02, N03, HH01

  • Installation of lighting equipment in the tower N02, N03, HH01

  • Aligning plumbing pipes, sanitation accessories at basement 1, tower N01

  • Installation of sprinkler on the ceiling at tower N01, N02, N03, HH01

 
Here are some photos of the project last week:

  

  New Horizon City is entering the finishing stage

 

 

Tool Box Meeting at the project





Engineers are checking the electrical switchboard at the project






Workers are completing the construction of plumbing system at the basement of aparment area



Workers are completing the construction of firefighting system at the basement of apartment area

 


Completing electrical sockets/ sanitation accessories at the apartment area

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49