Updated progress at Horizon Towers in the 23rd week

13/06/2017

Located at the golden gateway of the capital, the connection among North Tu Liem, Tay Ho and Ba Dinh District, Horizon Towers was dubbed as “the miniature world in the heart of Hanoi”, attracting the attention, hunting of many investors as well as customers.

The project has modern transportation system, adjacent to many main roads such as Ring Road 3, the extension of Nguyen Van Huyen, Phan Van Dong… that help customers easily move to the city center and suburbs. The project also has an available such as international schools, universities, hospitals, parks, entertainment areas… When completed, the project promises to be an ideal accommodation for over 9,000 residents.
The investor of the project, Hanoi Construction Corporation (Hancorp) is one of the leading companies in the field of construction of urban infrastructure. With the desire to bring the best quality product to the customers, Hancorp has meticulously paid attention to the “brainchild” of Horizon Towers right from the selection of contractors.
With 12 years of experience in the field of M&E works, Sigma has received the trust of the owner and the honor of becoming the Main Contractor of the project. After more than one year of installation and implementation, many works are stepping into perfection. Last week, from 5-10/06/2017, the typical works were being deployed as:
  • Pulling wiring for lighting, sockets of 20th floor at T3A Tower
  • Pulling wiring for corridor at Tower T3A, T3B, T4
  • Pulling wiring for lighting, sockets of 13th floor of Apartment No. 1, 2, 4, 17th floor
  • Pulling fire alarm cable
  • Installation to diffuser box and flexible duct connection in UT4 from 17th to 21st floor, UT3 from 15th to 18th floor.
  • Connection work for ventilation fan in basement 1
  • Installation exhaust system for kitchen room UT3 and UT4 on 25th floor
  • Installation gas pipe and insulation on 4th floor
  • Leaked test Air conditional condensed from 19th floor to 21st floor in UT3 and from 18th floor to 21st floor in UT4
  • Installation fans on roof top
  • Finishing all defect of water supply and drain pipe system at T3 & T4 tower
  • Finishing all defect of water supply and drain pipe system at technical of T3&T4 tower
  • High-pressure test for water supply system for apartment from 15th to 20th floor of T3 and T4 tower
  • Finishing all defect of water fire pipe system at T3 and T4 tower from 12th to 25th floor
  • Installation drain fire pipe for sprinkler system at technical rise from 4th to 25th floor
Here are some photos last week:
 

Overview of Horizon Towers project

 
Tool Box Meeting daily


Installtation ventilation fans on roof top

 

Installation Cable Ladder for Transformer room


Installation water supply pump at basement 2

 



Installation electrical system, HVAC system

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49