New Horizon City project at the completion phase

21/02/2017

Back to the end of 2014, the area of 19.903,1 m2 in a prime location at 87 Linh Nam, Hoang Mai District still empty. No one can imagine that this place will become the complex of a residential apartment, commercial center and office with 1.224 apartments which were developed according to integrated utility service model in Hanoi. However, over two years since the New Horizon City project officially started the construction, a real estate consortium was formed in the most dynamic urban center in the southeast of the Capital. 

Besides with the construction of civil works of four towers, Sigma always ensure the high quality and absolute safety in providing M&E services, willing to handover to the investor on schedule.
Currently, the M&E works of the project have been completed by 90%. Other categories are gradually coming into perfection, such as:
  • Installing electrical system:  installation of Electrical Cabinet 1,2 at Tunnel 1; lighting system at Tunnel 1, 2; installation of medium voltage cables at Tunnel 1; installation of cable tray, electrical main switchboard, lights and switches at Tower N02, N03, HH01; drag fire alarm cables, speaker cables at Tower N03; cut chisels and install conduit pipe in sound wall, drag lighting cables, fire alarm cables, speaker and CCTV cables at Tower HH01.  
  • Installing plumbing system: installation of drainage pipes, ventilation, check the drainage tube leakage; waterproofing drainage tube for apartments; installation of water supply pipes in the ceiling apartments; cut chisels and insert water supply; installation of pumping equipment in van, alignment of drainage pipes at Tower N01, N02, N03, HH01.
  • Installing fire system: installation of fire mains, fire pipeline pressure testing; installation of fire valves, installation of equipment and cabinets fire nozzles at Tower N01, N02, N03 and HH01.
  • Installing the ventilation system: construction and installation of the wind pipe, installation of ventilators at Tower N01, N02, N03 and HH01.
Some photos at New Horizon City project:
 
   
Tool Box Meeting

   
Installation of electrical system at 10th floor, Tower N01 and 27th floor, Tower N02

General perspective of New Horizon City project at the completion phase
 

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49