Besides with the construction of civil works of four towers, Sigma always ensure the high quality and absolute safety in providing M&E services, willing to handover to the investor on schedule.
Currently, the M&E works of the project have been completed by 90%. Other categories are gradually coming into perfection, such as:
- Installing electrical system: installation of Electrical Cabinet 1,2 at Tunnel 1; lighting system at Tunnel 1, 2; installation of medium voltage cables at Tunnel 1; installation of cable tray, electrical main switchboard, lights and switches at Tower N02, N03, HH01; drag fire alarm cables, speaker cables at Tower N03; cut chisels and install conduit pipe in sound wall, drag lighting cables, fire alarm cables, speaker and CCTV cables at Tower HH01.
- Installing plumbing system: installation of drainage pipes, ventilation, check the drainage tube leakage; waterproofing drainage tube for apartments; installation of water supply pipes in the ceiling apartments; cut chisels and insert water supply; installation of pumping equipment in van, alignment of drainage pipes at Tower N01, N02, N03, HH01.
- Installing fire system: installation of fire mains, fire pipeline pressure testing; installation of fire valves, installation of equipment and cabinets fire nozzles at Tower N01, N02, N03 and HH01.
- Installing the ventilation system: construction and installation of the wind pipe, installation of ventilators at Tower N01, N02, N03 and HH01.
Some photos at New Horizon City project:
Tool Box Meeting
Installation of electrical system at 10th floor, Tower N01 and 27th floor, Tower N02
General perspective of New Horizon City project at the completion phase