Total Internal Audit Report of N03 Horizon Tower project

08/10/2016

In the sequence of events of total internal program, in the end of September Sigma implemented overall internal assessment of N03 Horizon Tower  project in Xuan Dinh, Tu Liem, Hanoi.

 
 From September 2016, project’s total internal audit program (TIA) was applied for all on-going Sigma’s projects. It is considered as an independent and objective consideration touching all the fields in a project, it helps to assess the implementation of the work in the project whether efficient or not and it matches all regulations, requirements and standards of the company, the project and the law or not. The considered fields include: Safety, Quality, Resources, Finance, Schedule, and Compliance with other requirements. 
See more: Project Total Internal Audit Program at Sigma

There are some actual photos of the assessment:


Site Office is evaluated as neat, methodical place


Standard toolbox meeting



Gathering supplies tidily​

Main warehouse is neat, clean

 
Machining area is neat, clean and has railings.


The water shaft, fire, electricity covered by netting sure whether PP fiber.​
 

 
All duct mouth covered by plate definitely, catch bolts. 
Straight trough​
 

There are safeguards construction products
 

 
Take measures to protect the shaft, protect cable ladder 
 

There are signs on the site​

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49