The working atmosphere at Masteri West Heights project in the 6th week

15/02/2023

Possessing a diamond position in the heart of the capital's most livable metropolis - Smart City, Masteri West Heights embraces the 4.8-hectare central lake with open views towards 3 large continuous parks. It is the perfect product of Masterise Homes - a member of the Masterise Group, a pioneering real estate developer applying leading international standards in the development, operation, and management of high-end real estate products. level in Vietnam. The project is installed and constructed M&E system by Sigma, the leading M&E installation and service provider in Vietnam, promising outstanding service quality and a worthy experience to customers—products, contributing to creating sustainable values in the Vietnamese and international real estate markets.
 

Masteri West Heights is highly appreciated, because of its convenient transport connection, in less than 15 minutes, residents can move into the city center and key areas to the west of the capital. The project consists of 4 apartment towers, 2 38-storey towers, Z38.1,2, and 2 39-storey towers U39 M.1,2, with a total of 3,599 apartments on a total area of 3.1 ha. The project includes many types of development, including studio apartments, 1-bedroom, 2-bedroom, 3-bedroom, duplexes, and shops, bringing many choices for customers.

Proud to be the leading M&E service provider in Vietnam, Sigma is proud to be the M&E contractor of the project since November 2021. The items we are currently working on include items such as
  • Building U39.1 : M&E step 1: Construction of vertical drainage system to the 28th floor, floating electrical pipe T36; 36th floor recessed, 18th floor HVAC
  • Building Z38M.1 : M&E step 1: Construction of vertical drainage system to the 28th floor, floating electrical pipes on the 25th floor, wall recess on the 29th floor. HVAC on the 18th floor
  • Building U39.2: M&E 1 works: 38/39 floor. Complete ceiling equipment up to the 8th floor.
  • Building Z39.2: M&E 1 works: 37/38 floors. Complete ceiling equipment up to the 7th floor.
Some pictures of the project:
 

 
Overall perspective of Masteri West Heights project

 


TBM daily at the project



Working atmosphere at the Masteri West Heights project site office

 
Installation of HVAC condensate/Conduit installation

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49