Behind the speedy progress of FLC projects

08/08/2016

Sigma was extremely pleased when we were named as one of the main factors contributing to the speedy implementation of FLC projects.

FLC Chairman shared the secret of deployment speedy projects
 
With each project of FLC group, whether large or small, whether in the past or present, people always find the phrase: "Construction Ahead of Schedule” “lightning speed”, though this group did not locate itself being tied to speed. FLC representative said that their success based on their matching choices since the initial steps of making investment plans and thorough preparations for every problem. 
 
Vietnamnet (vietnamnet.vn) reported an article disclosing the know-how of FLC group with the share of Trinh Van Quyet- FLC Group Chairman at: :http://vietnamnet.vn/vn/kinh-doanh/304724/dang-sau-tien-do-than-toc-cua-cac-du-an-flc.html
Here are excerpts (to be translated into English version) relating directly to Sigma Engineering JSC:
 


 
Refer to other major newspapers reported the same news:

FLC Chairman shared the secret of deployment speedy projects

http://laodong.com.vn/bat-dong-san/chu-tich-flc-tiet-lo-bi-quyet-trien-khai-cac-du-an-than-toc-551785.bld

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49