Updated progress of Sunshine Riverside project in the 33rd week

21/08/2018

Located at the pier of the Nhat Tan Bridge, on the south bank of the Red River – which is famous for an ancient digs in Phu Thuong and executed by “Sigma people”, the Sunshine Riverside project is based on the idea that “the dragon picked up jade”, the backbone of the expressway connects from the airport to the city center, the dragon head toward the West Lake and Red River…

Besides many projects in the West Lake, Sunshine Riverside emerged as the real estate product with the value for life, a destination for the elite to choose a classy living space. The project is a commercial apartment complex combining high-class commercial services, including three apartment towers with the international schools, shopping centers and entertainment serves the resident community.

Sunshine Riverside is invested by the investor - Phu Thuong Construction Investment JSC, from planning, design and contractor selection to strictly follow the process. Sunshine Riverside is designed in a variety of area structure and reasonable in use. The natural light and wind are maximized to each apartment so that space is harmonious with the breath of West Lake, the Red River and the romantic scenery west of the capital.

Although the weather was not favorable in the past week, with the ability to execute outstandingly and commit to customers, Sigma still confidently deployed the M&E system of the project and always ensure the elements "aesthetics, quality and progress ". From 13/08 to 18/08/2018, the main works were being implemented in the project such as:
  •  Completion of the civil works from level 4 to level 29 of tower CT1
  •  Execution of the water drainage system and receive the site handing over from level 4 to level 27 of tower CT2
  •  Execution of the civil works from level 4 to level 29 of tower CT3
Some pictures of the project last week:
 
 
 
The appearance of the Sunshine Riverside project


 
The materials gathered at the storage was always clean and tidy



Tool Box Meeting daily is done in accordance with standards


Sigma engineers at the site office

 

Cable pulling at the apartment area on level 6 of tower CT3 


Testing electrical wires at the mock-up room level 6 – tower CT3

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49