Updated progress at Wyndham Soleil Danang project in week 15

14/04/2020

Not Hanoi – the hurried capital of Vietnam or Saigon – the bustling city is the most livable city in Vietnam, but it is Da Nang For many people, Da Nang is "where you come even dozens of times, you still like it as the first time, not your homeland but dear to the strangers!" It is true that Da Nang has beautiful things which might be so simple but also lovely to fall in love with.

Danang has a sea, and wherever there is a sea, there's a salty substance there. Looking down from above, the Danang coastline is blue and curved like a slender back. The most beautiful is, in the middle of poetry, the modern feature of the most up-to-date architectural work that has formed: Wyndham Soleil Danang.

To be known as the new symbol of Da Nang city, Wyndham Soleil owns 2 of the tallest towers in Vietnam, with 5-star facilities, meeting international standards such as Children's play area, Da Nang's largest commercial center, sauna, etc. Recently, with the common goal of contributing to the prevention of the Covid-19 disease, Wyndham Soleil Danang project has strictly complied with the decision of Danang People's Committee and Sigma Engineering JSC, implemented social distancing and didn’t organize TBM daily.

Last week, the works were being implemented at the project:
  • Cable pulling on the 2nd floor, wiring works at B2, conduit installation at low-rise elevators
  • Installation of drainage pipes on the 2nd floor
  • Installation of drainage pipes for kitchen area on the 4th floor
  • Constructing pump room on 23rd , 46th floor
  • Installation of air duct on the 2nd floor
  • Installation of steel pipes and ductwork insulation on the 2nd floor
  • Make a shop drawings of basements B1 and B2
  • Prepare a shop drawing for L23, L46.
Some pictures of the project last week:
 

Overview of Wyndham Soleil Danang

 

At the site office, Sigma engineer seriously wears a face mask

 
Executing recessed Plastic Rectangle Box on basement 3/  Executing electrical cabinet on L8

 
Materials are stored at the storage

 
Installation of water pump system on level 46 / Installation of electrical system 

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49