Updated M&E works at Flamingo Cat Ba Beach Resort project

20/06/2020

Flamingo Cat Ba Beach Resort is a "4-season symphony", a great song that harmonizes between heaven and sea. The project is located on an area of ​​over 70ha, with a prime location on the most beautiful beach of Cat Ba Island: Cat Co 1 Beach and Cat Co 2 Beach - The Paradise resort on the sea, with classy views embracing the whole view of the mountains and Lan Ha Bay, the Flamingo Cat Ba luxury resort complex gives customers a 5-star and extremely exquisite 5-star vacation.

Inspired by the immense forests on the mountain, along with a clear blue sea, mingling with bright yellow sunlight shining down on the romantic Cat Co 1 beach, the Flamingo Cat Ba project appears with harmonious architecture, precisely and meticulously invested in the beautiful beach of Vietnam.
Show up as an upright green forest, both unique and firm, is considered an ideal place for tourists and owners who love the natural beauty and admire the gorgeous scenery every morning
Flamingo Cat Ba is known by the meeting of many famous domestic contractors such as Ecoba JSC, Sigma Engineering JSC ... The high-quality materials and furniture are meticulously selected from  many world-famous brands such as Duravit, Bravat ... which bring the perfect choice for customers.
To be known as the M&E Contractor of the entire project, including 3 towers: Forest on the Sea, Forest in the Sun and Forest on the Sand, bringing completely different experiences to customers. The works were being implemented at the project include:
  • Tower 1
    • Officially operating the MEP system of the tower 1
  • Tower 2
    • Completing construction of hot and cold-water supply system
    • Complete energizing from MSB cabinets to the power distribution system for the floors
    • Operating Chiller system for towers 1 and 2
    • Completing pump room, fire pump
    • Installing equipment, repairing hotel rooms on the 7th floor
    • Construction of power supply, equipment installation and testing on functional areas, including laundry area, kitchen, staff area
  • Tower 3
    • Completing the water supply pump system
    • Completing hot and cold-water supply system on the roof
    • Completing construction of cold supply pipe through the bridge 48m high above the sea level
    • Construction of electromechanical system on the 12th floor
 
Some photos of the project:

 


Overview of Flamingo Cat Ba Beach Resort


 
Sigma workers are moving to the construction site



TBM daily at the project


  
Construction of Chiller pipeline from 11th floor of Tower 2 to 12th floor of Tower 3

Other articles

Partners
pn1
pn2
pn3
pn4
pn5
pn6
pn7
pn8
pn9
pn10
pn11
pn12
pn13
pn14
pn15
pn16
pn17
pn18
pn19
pn20
pn21
pn22
pn23
pn24
pn25
pn26
pn27
pn28
pn29
pn30
pn31
pn32
pn33
pn34
pn35
pn36
pn37
pn38
pn39
pn40
pn41
pn42
pn44
pn45
pn46
pn47
pn48
pn49
pn49