Updated M&E works at Flamingo Cat Ba Beach Resort project
20/06/2020
Flamingo Cat Ba Beach Resort is a "4-season symphony", a great song that harmonizes between heaven and sea. The project is located on an area of over 70ha, with a prime location on the most beautiful beach of Cat Ba Island: Cat Co 1 Beach and Cat Co 2 Beach - The Paradise resort on the sea, with classy views embracing the whole view of the mountains and Lan Ha Bay, the Flamingo Cat Ba luxury resort complex gives customers a 5-star and extremely exquisite 5-star vacation.
Inspired by the immense forests on the mountain, along with a clear blue sea, mingling with bright yellow sunlight shining down on the romantic Cat Co 1 beach, the Flamingo Cat Ba project appears with harmonious architecture, precisely and meticulously invested in the beautiful beach of Vietnam.
Show up as an upright green forest, both unique and firm, is considered an ideal place for tourists and owners who love the natural beauty and admire the gorgeous scenery every morning
Flamingo Cat Ba is known by the meeting of many famous domestic contractors such as Ecoba JSC, Sigma Engineering JSC ... The high-quality materials and furniture are meticulously selected from many world-famous brands such as Duravit, Bravat ... which bring the perfect choice for customers.
To be known as the M&E Contractor of the entire project, including 3 towers: Forest on the Sea, Forest in the Sun and Forest on the Sand, bringing completely different experiences to customers. The works were being implemented at the project include:
- Tower 1
- Officially operating the MEP system of the tower 1
- Tower 2
- Completing construction of hot and cold-water supply system
- Complete energizing from MSB cabinets to the power distribution system for the floors
- Operating Chiller system for towers 1 and 2
- Completing pump room, fire pump
- Installing equipment, repairing hotel rooms on the 7th floor
- Construction of power supply, equipment installation and testing on functional areas, including laundry area, kitchen, staff area
- Tower 3
- Completing the water supply pump system
- Completing hot and cold-water supply system on the roof
- Completing construction of cold supply pipe through the bridge 48m high above the sea level
- Construction of electromechanical system on the 12th floor
Some photos of the project:
Overview of Flamingo Cat Ba Beach Resort
Sigma workers are moving to the construction site
TBM daily at the project
Construction of Chiller pipeline from 11th floor of Tower 2 to 12th floor of Tower 3