• CLIENT : HAI AU HOTEL JSC
• PROJECT LOCATION: BAI CHAY, HA LONG CITY, QUANG NINH
• SCOPE OF WORKS : M&E MAINTENANCE & SERVICES
• CONTRACT DURATION : FROM 08/2010 TO 06/2014
After completing electrical works for Novotel Halong, the investor of the hotel was satisfied with our performance. Thereafter, the whole works of maintaining and improving electrical, chiller & HVAC systems were delegated to Sigma to make sure that the hotel can always operate at a high standard.
Novotel is one of the highest quality four-star hotels in Bai Chay Resort area, Ha Long city, Quang Ninh province.
Every year, the hotel welcomes thousands of domestic and international tourists and carries out important events with the presence of top authorities of the Party and the Government. HVAC system is paid special attention to ensure that air system always reaches standard temperature and that poisonous concentration is minimized to meet requirements of a four-star hotel.